|
Increasing needs to enlarge the maritime cargo shipping capacity in Ashdod Seaport
Resulted in the initiation of Hayovel Seaport Project.
The creation of 16 m water depth harbor required extensive nautical infrastructures and earthworks, construction of Moles Docs and Breakwater with over 13,000 pcs of cast
Concrete cubes of 40 ton each.
As a member of the concession group and the main construction contractor
Ashtrom is to complete the works in 2007.
|